Know what needs checking.
Independent third-party technical audit, Factory Acceptance Testing (FAT), and site verification for renewable energy and energy storage assets across the UAE. We identify microcracks, cell degradation, and harmonics before energization.
Certified technical audit scope
- ✓Electroluminescence (EL) module crack testing:Non-destructive high-resolution imaging detecting invisible silicon wafer micro-fractures and cell inactive zones.
- ✓Battery State of Health (SOH) & impedance spectroscopy:Direct electrochemical impedance measurement verifying capacity retention, internal resistance, and cell mismatch.
- ✓Harmonic distortion & IEEE 519 logging:High-speed power quality analysis measuring total harmonic distortion (THD), voltage sags, and phase imbalance.
- ✓Safety interlock & arc flash verification:Functional test of emergency trip loops, rapid DC shutdown, insulation monitoring devices (IMD), and gas suppression.
- ✓Certified stamped engineering audit report:Formal technical documentation including raw data curves, thermal images, categorized defects, and remedial actions.
Laboratory-grade field instruments
Our engineering team deploys calibrated diagnostic hardware meeting strict ISO/IEC certification benchmarks:
Solynx inspections utilize non-destructive diagnostic methodologies exclusively. Destructive metallurgical coupon testing, cell casing disassembly, or puncture tests are not performed.
Rigorous 3-phase audit execution.
Every audit follows an unalterable chain of custody and calibrated instrument log.
Scope Definition
Review of electrical single-lines, manufacturer data sheets, warranty specifications, and client audit objectives.
Customized inspection test plan (ITP).
Field Testing
Deployment of calibrated laboratory-grade diagnostic instruments, thermal cameras, IV curve tracers, and power quality loggers.
Executed on-site diagnostic test matrix.
Stamped Audit Report
Comprehensive engineering analysis, defect severity classification (Critical, Major, Minor), and prioritized remediation plan.
Delivered within 5 business days.
Common questions about quality inspections
Inspections are essential prior to accepting handover from EPC contractors (Factory/Site Acceptance Testing), before purchasing used solar/battery assets, following severe desert weather events, or during insurance underwriting audits.
Schedule an independent technical audit.
Ensure equipment integrity, regulatory compliance, and warranty protection with a certified Solynx inspection.